Multifunctional Holes Charcoal Pencil Sharpener Long Lead Core Art Drawing Sketching Pencils Manual Sharpener Drawing Supplies

$25.58

Sold By: aBtny

489 in stock

SKU: 1005006411485084 Categories: , ,
Estimated delivery on 1 - 15 December, 2026
aBtny

4.86

(10,199 Reviews)

Report Abuse

Bullet Points:

1.4-in-1 Manual Pencil Sharpener: The handheld pencil sharpener is designed with 4 holes. The L hole is suitable for large and thick charcoal pencils, the M hole is suitable for medium pencils, the S hole is suitable for small pencils, and the mini hole is used to sharpen the pencil lead. Can meet your various needs.
2.Proper Size: The size of this multi-functional 4-hole pencil sharpener is approximately 2.36*2.36*1.18 inches, which is very suitable for carrying. And it is made of very high-quality materials, durable and not easily damaged, and can be used for a long time.
3.Complete Equipment: This art sharpener is equipped with a lid and a box to protect the cutter and store pencil shavings. It can maintain the environment clean during use.
4.Multi-uses: This four-hole pencil sharpener has a very wide range of applications, and can be used for sketching, charcoal, and colored pencils. It is very suitable for adults, children and students to use.
5.Perfect Gift: The pencil sharpener is the perfect gift for kids, teachers, students, engineers, children, artists and anyone who needs a pencil sharpener!
Description
1. 4-in-1 manual pencil sharpener: The handheld pencil sharpener is designed with 4 holes. The L hole is suitable for large thick charcoal pencils, the M hole is suitable for medium pencils, and the S hole is suitable for small pencils.
2. Size and material: The size of the manual sharpener is approximately 6 x 6 x 3 cm/ 2.36 x 2.36 x 1.18 inches, made of transparent high-quality materials, durable and not easily damaged, and can be used for a long time.
3. Lid and box: The pencil sharpener is equipped with a plastic lid and box to protect the blades and store pencil shavings. Keep the environment clean during use.
4. Wide range of uses: manual pencil sharpeners can be used for sketching, charcoal, colored pencils, suitable for learning or painting art activities such as adults, children, and students.
5. The pencil sharpener is the perfect gift for kids, teachers, students, engineers, children, artists, and anyone who needs a pencil sharpener!

Specification:
Name: Multifunctional 4 holes Manual Pencil Sharpener with Lid
Material: metal
Size: about 6 * 6 * 3 cm/2.36 * 2.36 * 1.18 inches
Color: as picture shown

Packing List:
1* Manual Pencil Sharpener

Only logged in customers who have purchased this product may leave a review.

Reviews

There are no reviews yet.

Vendor Information

We expect this item to arrive by the estimated delivery date. We also calculate a maximum delivery date in case of delays that are out of our control. With our Money Back Guarantee, we’ll give you a full refund if the item isn’t delivered by the maximum delivery date.

You can initiate a refund on items within 27 days of delivery or the maximum delivery date if the item hasn’t arrived.Shipping FAQ.

More Products

Main Menu

Multifunctional Holes Charcoal Pencil Sharpener Long Lead Core Art Drawing Sketching Pencils Manual Sharpener Drawing Supplies

Multifunctional Holes Charcoal Pencil Sharpener Long Lead Core Art Drawing Sketching Pencils Manual Sharpener Drawing Supplies